GENERAL CONSTRUCTION
This two story flat was in need of a full renovation. After a full soft strip and demolition of internal wall the more technically challenging parts of the project was getting 5 separate steel beams into the building. With specific designs from our architect and interior designers we set to work on this challenging but very rewarding project.